Blog

Is Foam Lifting Effective in Winter? Cold Weather Concrete Lifting

Alison R. Sinclair | 17 Jan 2025

Cold-weather concrete leveling is essential for maintaining safe and functional infrastructure during the winter months. Freezing temperatures, snow, and ice can cause concrete surfaces to shift, crack, and settle unevenly, creating safety hazards for residences and businesses alike.

While traditional methods like mudjacking often struggle in freezing temperatures, polyurethane concrete lifting provides a more effective and long-lasting solution. However, performing foam jacking in cold winter months requires adjustments in materials, techniques, and operation and storage to ensure success.

Key Facts About Cold-Weather Concrete Leveling:

  • Concrete lifting can be done in cold weather, but proper material handling is essential.
  • Polyurethane foam expands and cures quickly, even in colder conditions, making it ideal for slab lifting services.
  • Ground temperature is a critical factor—as long as the ground temperature remains above freezing, polyurethane concrete leveling can be successfully completed.

In this guide, we’ll explore whether or not cold-weather concrete leveling is effective, the challenges it presents, and how expert concrete raising professionals ensure high-quality results in frigid temperatures.

Key Takeaways

  • Foam lifting can be done in winter with proper precautions – While cold temperatures slow expansion and curing, heated storage, insulated hoses, and pre-warming slabs ensure successful concrete leveling in frigid conditions.
  • Ground temperature matters more than air temperature – As long as the ground remains above freezing, polyurethane foam expands and cures effectively, even if the air temperature is below 32°F (0°C).
  • Foam lifting outperforms mudjacking in cold weather – Unlike cement-based slurry, which is prone to freezing, polyurethane foam remains lightweight, stable, and provides insulation benefits that help prevent future freeze-thaw damage.
  • Proper material handling ensures consistent results – Heated equipment, winter-formulated foams, and insulation blankets help maintain optimal foam performance and prevent premature cooling during application.
  • Snow and ice must be removed before foam injection – Moisture on the slab can interfere with adhesion and expansion, so surfaces must be dry and warm for the best lifting results.
  • Winter-grade foam formulations improve cold-weather performance – Some polyurethane foams are designed for winter use, allowing for better expansion, adhesion, and durability in freezing conditions.

Can You Lift Concrete in Cold Weather?

Lifting concrete in winter is possible, but it requires careful planning. Ambient temperature, ground temperature, and the amount of sunlight hitting the slab all play a role in the effectiveness of polyurethane concrete raising. If temperatures are too low, the foam’s viscosity changes, affecting how it expands and cures.

The Challenges of Concrete Lifting in Cold Temperatures

One of the biggest challenges of polylift concrete leveling in winter weather is ensuring that foam is evenly distributed beneath the slab. Cold-weather conditions can slow the reaction time of injection foam, making it more difficult to achieve proper lifting.

Other key challenges include:

  • Ground freezing – When temperatures dip below freezing, the ground contracts, causing voids beneath the concrete surfaces to expand. This makes it harder to level concrete accurately.
  • Foam curing issues – Spray foam in cold weather can take longer to fully expand, leading to inconsistent results if not properly managed.
  • Freeze-thaw damage – Repeated freezing and thawing cycles cause slabs to crack and shift, requiring polylifting before additional damage occurs.

How Temperature Affects Foam Expansion and Curing

Polyurethane concrete leveling is designed to work in a range of conditions, but air temperature and ground temperature impact how well the foam reacts once injected under the slab.

  • The ideal ambient temperature for poly level foam expansion is between 55 and 80 degrees Fahrenheit.
  • If air temperatures drop below freezing, the foam may not fully expand, affecting the lifting process.
  • Ground and concrete temperature is more important than air temperature, as cold slabs absorb heat from the foam, slowing the curing process.

For best results, expert concrete raising professionals take extra precautions when working in cold winter months.

Why Foam Lifting Works Better Than Mudjacking in Cold Temperatures

When compared to mudjacking, polyurethane concrete lifting offers significant advantages, particularly in frigid temperatures. While mudjacking relies on a stone slurry grout mixture, which is prone to freezing, foam concrete remains lightweight, stable, and highly effective in colder weather.

Differences Between Foam and Stone Slurry Grout Methods

Stone slurry grout leveling materials contain a significant amount of water, which makes them susceptible to freezing temperatures. This slows down the curing process and can even cause the material to crack before it fully sets.

On the other hand, polyurethane foam lifting:

  • Requires smaller openings for injection, reducing surface damage.
  • Expands rapidly, ensuring foam is evenly distributed under the slab.
  • Provides insulation benefits, helping to prevent future freeze-thaw damage.

Why Traditional Mudjacking Struggles in Winter

Traditional mudjacking methods are not designed for cold-weather concrete leveling. Larger openings make it difficult to maintain slab stability, and slurry mixtures take significantly longer to cure in cold winter months. In contrast, polylifting is faster, more efficient, and better suited for colder conditions.

Spray Foam Insulation Benefits for Concrete Leveling Repair

Spray foam insulation for cold weather adds an extra layer of protection for concrete surfaces, reducing the risk of damage from freeze-thaw cycles. Closed-cell spray foam is particularly useful in winter weather, as it helps maintain slab stability by preventing water infiltration.

What Is the Ideal Temperature for Concrete Lifting?

For polyurethane concrete leveling to be most effective, both air temperature and ground temperature must be considered.

Temperature Guidelines for Foam and Grout Leveling

  • Polyurethane foam performs best at 55-80 degrees Fahrenheit but can still be applied in colder weather with proper adjustments.
  • If the ground temperature is above freezing, the foam will still expand properly, even if ambient temperatures are low.
  • Heated storage and insulated hoses help maintain proper foam consistency before spraying a substrate.

How Insulation Impacts Foam Performance

  • HFO foam technology enhances expansion in frigid temperatures, improving adhesion to concrete surfaces.
  • Insulation blankets are used to keep slabs warm before application, preventing thawing and refreezing cycles.
  • Professional concrete contractors use heated foam storage to ensure smooth application in cold-weather conditions.

How to Prevent Concrete Slab Settlement in Winter

Cold-weather concrete leveling is essential for preventing sunken slabs and maintaining infrastructure stability. Without proper maintenance, concrete surfaces can become hazardous in frigid temperatures.

Common Causes of Winter Slab Movement

  • Freeze-thaw cycles cause soil to expand and contract, leading to concrete damage.
  • Water infiltration beneath slabs results in erosion, creating voids that lead to sinking.
  • Sunken concrete creates trip hazards and structural instability, requiring urgent slab lifting services.

The Role of Spray Foam Insulation in Stabilization

By using polyurethane concrete raising, contractors can:

  • Stabilize uneven concrete before additional damage occurs.
  • Ensure that foam is evenly distributed, preventing voids from reforming.
  • Extend the lifespan of concrete surfaces, reducing the need for costly repairs.

Contact Superior PolyLift for Expert Cold Weather Concrete Lifting

If you're dealing with sunken slabs, uneven concrete, or winter-related foundation issues, reach out today to Superior PolyLift. We specialize in polyurethane concrete lifting, ensuring reliable, long-lasting results in cold winter months.

Why Choose Superior PolyLift?

  • Experienced in polylift concrete leveling for industrial and municipal projects.
  • Advanced slab lifting services using state-of-the-art poly level foam technology.
  • Proven track record in professional concrete leveling repair, even in frigid temperatures.

Don’t let winter weather affect your infrastructure. Reach out today to schedule your polyurethane concrete leveling project with Superior PolyLift!

Discover Innovative Concrete Solutions Today

Explore how our expertise can benefit your project. Reach out to our team for a consultation and discover the best solutions for your needs.

share this article:
Popular Categories
Recent articles
FAQs
No, apply spray foam in cold conditions without proper heating can lead to poor expansion and weak adhesion. For best results, contractors use heated storage, insulated hoses, and spray foam application techniques that keep the material at an optimal temperature before injection. This ensures proper bonding and expansion even in lower temperatures.
In cold weather, concrete lifting foam may take slightly longer to cure compared to warmer conditions. Typically, polyurethane foam cures within 15–30 minutes, but in lower temperatures, this can extend to an hour. Proper preparation, such as ensuring the ground temperature is above freezing, helps maintain fast and even curing times.
Yes, if the ground and concrete temperatures fall well below freezing, concrete leveling can be done but with additional steps. Ideally, polyurethane foam should be applied when the ground temperature is at least 32°F (0°C). If it's too cold, heating blankets, temporary enclosures, or direct slab heating may be required to ensure proper expansion.
No, polyurethane concrete lifting foam is designed to withstand extreme temperatures, including winter conditions. Once fully cured, the foam remains stable and unaffected by freeze-thaw cycles. Properly applied foam will last for decades, maintaining structural integrity even when exposed to snow, ice, and fluctuating temperatures.
Yes, concrete leveling can be done on roadways and highways in winter, but traffic control and timing are key. The foam sets quickly, allowing roads to reopen within hours. However, contractors must monitor ground and concrete conditions to prevent premature cooling, which could impact the foam’s expansion and adhesion to the slab.
Yes, spray foam application in cold temperatures must be done with care. Polyurethane foam can become too stiff or cure unevenly if the material temperature isn’t maintained. By using heated equipment and keeping foam components at an ideal storage temperature, contractors can ensure strong, reliable lifting results even in cold winter months.

To ensure the concrete lifting foam expands properly in winter, contractors:

  • Use insulated hoses and heated storage for materials.
  • Monitor ground temperature to prevent rapid cooling.
  • Apply spray foam in cold conditions only when necessary steps, like pre-warming the slab, have been taken.
Yes, snow and ice must be completely removed before spray foam application begins. Moisture trapped between the foam and slab can interfere with bonding and expansion. Additionally, frozen surfaces may lead to uneven lifting, causing voids. Contractors typically dry or warm the slab before injecting polyurethane foam to ensure the best results.
Yes, concrete leveling can be done successfully even if temperatures drop after application. As long as the foam is properly mixed, heated, and injected under the slab while the ground temperature is at an acceptable level, the curing process will continue without issues. However, extreme temperature drops below 20°F (-7°C) may slow down final curing.
Yes, some manufacturers offer specialized concrete lifting foam designed for cold-weather conditions. These formulations have additives that allow them to cure more effectively in cold temperatures. While standard foam works well in most conditions, winter-grade polyurethane foam ensures optimal expansion and bonding when applied in cold winter months.
Find Out How We Can Engineer a Solution For You
Superior Polylift Logo
A Division of Superior Grouting
crossmenu linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram Skip to content